Tuesday, March 24, 2009

New 3-way installed

The new 3-way stub switch has been installed. She works beautifully. My most difficult pieces are a poorly balanced Grandt Line porter which has an out of gauge driver and was half destroyed by my childhood...and some unweighted Grandt Line Steel Underframe cars (the light weight and SUF cause the trouble)...the porter handled it like a champ...as did the SUF cars.

Within the next week, I'll have to start bridge building. I'll post photos within the next few days.

No comments: